Floor Fixings for Beam Seating.
FF3
Pre-drilled holes in frame Welded brackets
for floor fixing bolts for floor fixng bolts
FF2
Welded brackets
for floor fixing bolts for floor fixng bolts
These are made to order so lead time for these is 3weeks.
Please Note
Floor-fixing bolts not provided as different floor surface require different types of bolts.